DEMOLITION PERMIT APPLICATION

  1. JacksboroLogo
  2. CITY OF JACKSBORO

    112 W. Belknap Street
    Jacksboro, TX 76458

    940-567-6321

  3. DEMOLITION PERMIT APPLICATION
  4. PROPERTY OWNER INFORMATION
  5. CONTRATOR INFORMATION
  6. DEMOLITION GUIDELINES

    DEMOLITION PERMIT
    Applicants wishing to remove a building / structure from a property or demo the interior must first obtain a Demolition Permit. A demo permit is required for the demolition of any structure or building regardless of whether it is a commercial or a residential property. A building demo permit requires the removal of all construction materials from the jobsite. The site must be left free of debris and be level within the boundaries of the property. A demo permit does not authorize work located in the right-of-way such as, "sidewalks, driveways, curbs, or accessibility ramps". 

    PERMITS
    Step 1 Plumbing Permit: A Plumbing Permit shall be purchased to disconnect all sewer, water and gas supply lines connected to the building/structure being demolished. The plumber must have these utilities disconnected from the city source, capped off, inspected, and finaled by the Building Inspector prior to issuing a Demolition Permit.  
    Step 2 Electrical Permit: If the power lines are still connected to the structure, an Electrical Permit must be purchased to remove them before the Demolition Permit can be issued. This permit will be inspected and approved by the City Building Inspector.  
    Step 3 Asbestos Survey: Commercial structures require proof of an asbestos inspection from a state certified third party inspector or letter from the Architect or Engineer before a Demolition Permit can be issued. Proof of the asbestos inspection must be provided to the Building Official prior to issuing the demo permit.  
    Step 4 Applying for the Demolition Permit: 
    When all requirements have been completed, a Demolition Permit will be issued. 

    DEMOLITION PERMIT FEE                     $50.00

  7. NOTICE FOR INSPECTIONS

    24 HOURS NOTICE REQUIRED ON ALL INSPECTIONS

    TO REQUEST INSPECTIONS, PLEASE CALL JACKSBORO CITY HALL 940-567-6321   8 AM – 5 PM

    MAKE ALL CHECKS PAYABLE TO “CITY OF JACKSBORO”

    THANK YOU FOR YOUR BUSINESS!

  8. Acknowledgements

    * Construction debris will not be collected with the regular trash service and disposal is the responsibility of the applicant.
    * Contractor must be registered with the City of Jacksboro and must provide proof of liability insurance.
    * All fees shall apply; except that if any person shall make an application for a permit as provided in this division, after the work has been started or after the work has been partially completed or concealed, such persons shall pay double the fee or fees which would ordinarily be required. 
    * I understand this application will not be accepted if all required documentation and application fees are not recieved within 5 business days of submitting the application.
    * Property Owner or Authorized Agent must sign/submit the Demolition Application. Submitting of this application affirms that I am stating that I am the Property Owner or Authorized Property Owner Representative.  As a Property Owner Representative I have uploaded or will provide proof of legal representation.
    * Submitting of this application affirms that ALL utility lines have been located and ALL utility services have been property permitted, disconnected and capped/plugged. 
    * SUBMITTING OF THIS PERMIT AFFIRMS MY ACKNOWLEDGEMENT FOR THE RESTRICTIONS OF THE DISPOSAL OF RUBISH SET FORTH BY THE TCEQ.

  9. Acknowledgement*
  10. Leave This Blank:

  11. This field is not part of the form submission.